Projet: PETROBRAS US - Cascade 2A remediation
NOBLE ENERGY- ALEN project
ENBRIDGE - Enbridge Project
Tasks:
• Development of the new SRU (slack Removal Unit) to secure the Cascade/Chinook field's buoyancy can. Improvement of the original concept by a better control of the securing tension and by saving 50% of the initial weight. SRUs strength analysis performed in accordance with AISC and API and fatigue calculation done with DNV standard.
• In charge of the follow up of TECHNIP Canada (structural department) and collaboration with TECHNIP UK (Geotechnical department) to develop the Initiation and RRS (Riser Restraint System) pile for ALEN Project.
• Led the engineering process (drafting, geotechnical, installation analysis...) and perform the design of the ILS (In Line Sleds) and PLEM (Pipe Line End Manifold) for Enbridge Project.
Enbridge equipments are the heaviest PLEMs (two valves, two hubs and Piggable Wye) and ILSs (three valves, one hub and Piggable Wye) designed and installed by Technip Houston.
2009 - 2011Client: Technip Paris
Projet: REPSOL - Montanazo&Lubina project
NOBLE ENERGY- ASENG project
BRITISH PETROLIUM (BP)- BLOCK31 project
Tâches effectuées:
• Collaboration avec les divers départements (département installation, flexible, géotechnique) afin de garantir la qualité des données techniques pour le design des équipements subsea.
• Calcul à la main et analyse par éléments finis (Statique, flambement, énergétique) des structures subsea telles que les Suction Piles (Manifold Pile, Initiation Pile et Restraint Pile),Installation aids, en utilisant les standards parapétroliers (API, DNV, AISC…).
• Gestion de dessinateurs et de leurs tâches journalières.
• Redaction des Design Report, CN, Scope of Supply (SR), Material Requisition (MR), Manufacturing Specification (SP) et Technical Bid Tabulation (TBT).
• Suivi des documents sous traitants et participation aux FAT (Factory Acceptance Test) (Socarenam, Technip Offshore Finland, Unitech,etc..).
2008 - 2009Client: Technip Paris
Projet: SAIPEM- OLOWI project
Tâches effectuées:
• Collaboration avec le département flexible.
• Calcul à la main, Analyse par éléments finis (Statique et fatigue) des structures subsea telles que les Hold Back Clamps, Tether Clamps, buoys, en utilisant les standards parapétroliers (API, DNV, AISC…).
• Gestion de dessinateurs et de leurs tâches journalières.
• Redaction des Design Report, CN, Scope of Supply (SR), Material Requisition (MR), Manufacturing Specification (SP) et Technical Bid Tabulation (TBT).
• Suivi des documents sous traitants et participation aux FAT (Factory Acceptance Test) (Dornser, Bardot Group, etc..).