2008 - 2010• Management of grid connection procedures in relation with system operators (Portfolio of up to 60 Windfarms).
• Design and construction follow-up of wind farms electrical infrastructures
• Wind farms commissioning (74 MW commissioned)
• Wind farm operation (Responsabilitie of 2 to 3 wind farms)
• Wind farm grid connection pre-studies
2008 - 2008Master thesis at Gamesa "Wind farms grid connection in France"
Management of Gamesa Energy France portfolio grid connection procedures (Portfolio of around 60 projects).