SolarReserve develops concentrating solar power (CSP) plants with an integrated molten salt thermal energy storage technology.

• 50 MW Alcázar Solar Thermal Power Project, Madrid, Spain (exp. production: 300,000 MWh /yr, baseload generation profile)
- Developed electrical, instrumentation and piping material take-offs (MTO) to establish a basis for substantiating and challenging the EPC contractor’s rough order of magnitude (ROM) estimate for the construction of the plant.
- Reviewed EPC Phase I engineering deliverables (P&ID’s, single line diagrams, water balances, heat & mass balances).
- Reviewed general arrangements, made proposals to reduce the overall plant footprint considering constructability, and by optimizing piping and electrical cable routing, as well as building size requirements.
- Conducted design reviews with Pratt & Whitney Rocketdyne (supplier of molten salt system) and the EPC contractor.

• 150 MW Rice Solar Energy Project, Riverside County, CA (exp. production: 450,000 MWh /yr, dispatchable generation profile)
- Supported the process of responding to Data Requests issued by the California Energy Commission (CEC) following submission of an Application for Certification (AFC).

• 100 MW Crescent Dunes Solar Energy Project, Nye County, NV (exp. production: 480,000 MWh /yr, dispatchable generation profile)
- Evaluated proposal for an EPC specification developed by WorleyParsons.

Engineering - Projects management
Professional experience
2008 - 2009

• Detail Engineering of a Selective Catalytic (NOx) Reduction unit, CHEVRON, El Segundo refinery, CA
- Rescued the project from an instrumentation standpoint through tactful customer interface, and aggressive schedule recovery planning with suppliers and in-house engineers.
- Led a project team of five engineers and designers. Reviewed deliverables and material requisitions.
- Ensured conformance of suppliers with technical, budgetary and delivery requirements.
- Provided engineering support during commissioning: responded promptly to customer and field inquiries (RFI).

• FEED of an Ethylene Plant, SAUDI ARAMCO & THE DOW CHEMICAL CO.
- Developed piping and instrumentation diagrams.
- Developed an application capable of transferring spreadsheet-based process data to a database, saving the project approximately $30,000 in man-hours.

• Sludge Incinerator, SONATRACH, Algeria
- Developed man-hour and material cost estimates for the instrumentation and process control of a sludge incinerator.

Petroleum or Petrochemical and related industries
2006 - 2008

Capital projects and Engineering work orders, CHEVRON, El Segundo refinery, CA (276,000 bpd)

• Deployment of Foundation Fieldbus technology in the tank farm.
- Led a project team of four engineers and designers.
- Directed job walks with client and determined project objectives.
- Developed the work scope, schedule and budget for project totaling $50 million. Managed change orders.
- Conducted process control design reviews and HAZOP's.
- Designed a Foundation Fieldbus network architecture, allowing control and monitoring of 500 valves and 30 pumps.
- Prepared material requisitions, reviewed vendor quotes and finalized technical bid analysis.

• Instrumentation of a deaerator: specification and bid evaluation of control valves, safety valves and field instruments.

• Design of construction work packages in preparation for unit turnarounds (LSFO, Coker).

Petroleum or Petrochemical and related industries
2005 - 2006

Detail Engineering of a LNG plant, YEMGAS, Balhaf, Yemen ($2.5 billion contract, 6.7M tons of LNG per year)

- Developed the instrument and control philosophy.
- Designed the control and safety system's network architecture.
- Developed logic diagrams and control narratives.
- Qualified control and safety system vendors. Reviewed their detail design to ensure conformance to the defined system requirements.

Petroleum or Petrochemical and related industries
2005 - 2005

• Lacq Gas Processing Plant, TOTAL, France
- Retrofitted the fire & gas and emergency shutdown systems for the plant.

• Rhourde Hamra gas fields, SONATRACH, Algeria
- Prepared a technical proposal for the supply of a SCADA system, comprising a voice/data transmission system + solar power system.
- Directed a job walk on site with the client.

Petroleum or Petrochemical and related industries
2003 - 2005

Dalia project, TOTAL, Angola

Design of the fire & gas (F&G) and emergency shutdown (ESD) systems for a floating oil production installation (FPSO).
- Developed the safety system network architecture, the logic diagrams and the cause & effect matrices for the F&G and ESD systems.
- Programmed F&G and ESD applications for Triconex safety controllers (Tricon).

Petroleum or Petrochemical and related industries
Education

Visitors to this profile also viewed these profiles
Boussetta Nizar
Ingenieur génie chimique de procédé, ENIG.petrochemical engineer-Arabian Gulf
Vikram Razdan
Managing Consultant, Plax, United Kingdom
Syam Kumar
HSE Professional (NEBOSH, IIRSM, OHSAS 18001) +15 years experience
Vladislav MASLAK
Ingénieur planning / gestion de projet
Jérôme DROUIN
Responsable service agenceur, IKEA
Mustapha Boutouizera
Nuclear I&C Engineer, SOFINEL
Abdeljalil Touil
Service domaine H.T.A , engineering-mv
Erick Casas
Cook, sams restaurant
Heidi Rodriguez
Chef, Culinary Dinasty
James Coleman
Freelance, JC Ventures
Viadeo for your career: Create a profile